Skip to content
Better Homes

Kitchen renovations in London

A kitchen made for the way you live.

A kitchen should make the everyday easier and leave room for the good bits. Preparing dinner together. A coffee before everyone wakes. Friends who stay a little longer. We bring the layout, storage and fitting together around how you like to live.

5.0/5 · across all review platformsExtensions, lofts and renovations

Kitchen renovations project by Better Homes in London
Rated by homeowners
5.0 / 5Across all review platforms
Completed work
Specialist buildersExplore our projects →
Insurance cover
Up to £10 millionRequest insurance details →
Workmanship guarantee
Up to 10 yearsCover by work type
Guide budget
From around £20,000 for a full redesign
Typical construction programme
Typically 3 to 6 weeks on site
Workmanship aftercare
2 years for kitchen installation

Life in your finished home

For the rushed mornings and the long dinners.

Start with the moments you would like to make easier. We will help you think through the possibilities, the space you have and what feels right for your budget.

Cooking feels easier

Worktop where you need it, appliances within easy reach and enough room to move without getting in each other's way.

Everything has a place

Pans, groceries and the favourite mugs, all close to where you use them. Less searching, more clear worktop.

Room for company

A seat for someone to chat while you cook. A table for another place setting. A kitchen that feels welcoming beyond mealtimes.

Explore your options

£12,000 to £18,000

Basic refresh

Best when the layout broadly works and the goal is to replace tired cabinetry, surfaces and finishes without major reconfiguration.

Around 3 to 4 weeks

£20,000 to £35,000

Mid-range redesign

The strongest fit for most London kitchens where you want a better layout, stronger storage, upgraded finishes and a more resolved design.

Around 4 to 6 weeks

£35,000 to £60,000+

High-end or structural kitchen project

Used when the project includes structural openings, premium cabinetry, higher-spec appliances, bespoke detailing or a more ambitious design brief.

Often 5 to 8+ weeks

Your quotation

Know what is included before we begin

Your quote explains the work, what it costs and the choices still to make. We talk it through with you, so you feel comfortable with the plan before work begins.

  • Strip-out and preparation

    Removing the existing kitchen cleanly, preparing the room properly and dealing with the practical realities that affect the new install.

  • Plumbing and electrics

    First-fix and service changes for new layouts, appliance positions, lighting, extraction and the day-to-day functionality of the room.

  • Units, worktops and cabinetry fitting

    The core installation work that determines how the kitchen looks, feels and performs long after the handover.

  • Tiling, decorating and finishing

    The surfaces, trims and final detailing that make the difference between a kitchen that is merely new and one that feels properly finished.

  • Appliance fitting and final connections

    Integrating appliances cleanly and safely so the kitchen works as a complete room rather than a collection of separate parts.

  • Snagging and closeout

    The final pass where tolerances, finishes and usability are checked so the result feels premium, not rushed over the line.

Design and construction

Your choice of architect. Support either way.

You need design support

If your project needs an architect, we can recommend one. They prepare the drawings. We help you understand what the options mean for the build and your budget, and can look after the conversations and follow-up questions. You choose the design and approve the cost.

You have your own architect

We are happy to work with them, whether your drawings are underway or complete. If you wish, we can speak with them on your behalf and keep the plans and building work moving together. You stay informed and make the decisions that matter to you.

Your architect prepares the drawings and agreed professional submissions; we manage construction. Our proposal sets out the coordination support you want, each appointment and the fees before you commit.

How we work

From your first ideas to feeling at home

  1. 01Tell us what you have in mind

    We listen to what you want from your home, talk through your budget and explain the next steps. You do not need every detail decided.

  2. 02Make a plan you feel good about

    We work through the drawings and choices with you and your design team, then agree the work, price and timing before building starts.

  3. 03Stay informed while we build

    Your project lead updates you each week and explains any decisions you need to make. We check the finishing details with you and give you a clear aftercare contact.

Cost planning

A clearer picture of what it could cost

From around £20,000 for a full redesign. Scope and specification determine the final price. Check the written quotation for VAT, professional fees, product allowances and contingency. Planning ranges are not a fixed offer.

Built on trust

Care during the build. Support afterwards.

We want you to feel looked after while we work and once you are settled in. Your project lead keeps you informed, and you have a clear contact for questions afterwards. Your workmanship cover is matched to the work we have done and explained before you commit.

Manufacturer warranties and insurance are separate. Read about our guarantee and read independent homeowner reviews.

Plan your project

Apply the guidance to your home.

Explore the scope and investment for your kitchen, then discuss the work your home needs. See our London service areas for local project information.

Useful to know

Questions you may be considering

How much does a kitchen renovation cost in London?
Most London kitchen renovations sit between roughly £12,000 and £60,000+, depending on the size of the room, cabinetry level, worktops, appliances and whether layout or structural changes are involved. Many serious kitchen projects start from around £20,000.
What is included in a kitchen renovation?
A full kitchen renovation usually includes strip-out, plumbing and electrics, cabinetry installation, worktops, tiling, appliance fitting, decorating and final snagging. Some projects also include layout changes or structural opening works where needed.
How long does a typical kitchen project take?
Most kitchen installations take around 3 to 6 weeks on site. Straight replacements can be quicker, while structural work, supplier lead times and wider layout changes can extend the overall programme.
Do you offer both design-build and installation-only kitchen projects?
Yes. We can manage the full design, supply and install route, or step in as the installation team if your kitchen has already been designed and sourced.
Do you handle structural kitchen reconfiguration?
Yes. We can deliver structural modifications where required, including layout opening, service coordination and the integration work needed when a kitchen project is part of a bigger change to the home.
Can we stay in the house during a kitchen renovation?
Usually, yes, if the work is limited to the kitchen and you can tolerate dust, noise and a temporary cooking setup. You will be without a normal kitchen for part of the programme. We agree working hours, protection routes and key shutdowns before site starts so you can make a realistic decision.
Should we order the kitchen before appointing the installer?
Ideally the installer should review the plan, measurements, service positions and delivery schedule before the final order is placed. That catches clashes early, especially around appliances, worktop templating, extraction, fillers and older walls that are not square.
Who signs off gas and electrical work in a new kitchen?
Gas work is completed by a Gas Safe registered engineer and relevant electrical work by a qualified installer. The applicable certificates are part of the handover information, alongside appliance and product documents supplied for the project.
What happens if cabinets or appliances arrive late?
We plan procurement and confirm critical lead times before strip-out. If a supplier delay still occurs, we resequence work where practical and tell you immediately how it affects the programme. Starting demolition before key products are confirmed is one of the easiest avoidable causes of kitchen delay.
How do you control kitchen renovation costs?
We define the build scope, product allowances, exclusions and responsibilities before work starts. Changes are priced and agreed before they are carried out. The biggest cost risks are usually late layout changes, unresolved appliance specifications and structural work discovered after design has already been fixed.

Your next step

What would make your kitchen a better place to be?

Whether you have drawings ready or just the beginnings of an idea, we would love to hear about it. Tell us about your home and your budget, and we will help you work out a sensible next step.